Not consistent with our usual consignments, FPS undertook a rather different project providing a pontoon complete with tower scaffold to do some inspection work on duct work in a nearby swimming pool. The client had explored many options to do this, however, the best and most cost effective way was to have a pontoon in the pool allowing the engineers to explore all areas of the duct work with ease. As the pool didn’t close until 9.30pm, FPS operatives couldn’t commence the install until 10pm, but such was the ease carrying out the inspection we were dismantling the pontoon at 12pm and home for 1pm. The client was extremely happy with our solution and subsequently we have been asked to help with 2 further swimming pools over the next week.
Recent Posts
Categories
- Accreditation
- bridge maitenance
- Bridge Pontoons
- Canal
- Canal Bridge Repair
- Canal Swing Bridge Repair
- Commercial Pontoons
- Covid-19
- Demolition Work
- Events Pontoons
- Fall Protection Pontoons
- Floating Pontoon Solutions
- Floating Pontoon Walkway
- Modular Pontoon Hire
- Pontoon Delivery
- Pontoon Hire
- Pumping Pontoons
- railwayaccess
- Silt Removal Pontoons
- Sponsorship
- Swimming Pool Pontoons
- Uncategorized
- Working Platform
Tag Cloud
Access
Airport
Bridge
Bridge Access
Bridge Demolition
Bridge Inspections
Bridge Removal
Bridge Repair
Bridge Repair Work
Canal
Canary Wharf
Construction
ConstructionLine
Fall Protection
Film
Floating
Floating Platform
Floating Platforms
Floating Pontoon Platform
Floating Pontoons
Gold
Hire
London
Manchester
Pipe
Platform
Pontoon
Pontoon Delivery
Pontoon Hire
Pontoon Installation
Pump
Railway
Regents Park
Repair
RISQS
Scaffolding Pontoon Access
Scaffold Tower
Scotland
Silt
Swimming Pool
Tow Path
TV
Walkway
Walkway Access
Yamaha SuperJet