Here we are doing a bridge survey on one of the Leeds rail lines and also fitting new metal bracing straps around the supporting legs to prevent any future bulging. The pontoon was 5 meters by 5 meters to supply adequate access and carry the required weight to support the metal bracing straps.
The bracing straps then had to be hoisted up to the required height on the support legs then bolted in place.
These floating platforms can be made to any size and shape required we can also provide tower scaffolding so you can reach your required height.
Outboard engines can also be fitted to the pontoon if required to manoeuvre under the bridge soffit to gain required access to all areas.
All of these floating platforms can be delivered throughout the U.K.