This week, Floating Pontoon Solutions commenced the first batch of the 30 bridge inspections they have been awarded by a specialist infrastructure services company. FPS are providing a mobile solution that comprises of a 5m x 4m pontoon, a boat, and tower scaffold allowing all eventualities to be covered. The team are visiting either one or two bridges a day with the client and assisting with the inspections utilising their skills and knowledge gained over the years in this line of work. With week one completed successfully, we are looking forward to next week, though hopefully the weather will be a little warmer!
Recent Posts
Categories
- Access solutions
- bridge demolition
- bridge inspections
- Bridge Painting
- bridge repair
- canary wharf
- cheshire
- Commercial
- Cornwall
- cumbria
- Engineering Sector
- fall arrest
- Floating Pontoon Solutions
- gloucestershire
- Grand Union Canal
- Happy Christmas
- Happy New Year
- heathrow airport
- hull
- kampus
- leeds
- lincoln
- linton bridge
- London
- Manchester
- merseyside
- Modular Pontoon Hire
- Newlay Bridge
- News
- North Lincolnshire
- PASMA
- Pedestrian Walkway
- Pontoon hire
- pontoon walkway
- Promotional Video
- scotland
- silt removal
- Southall Waterside
- survey
- swimming pool inspection
- Temporary Walkway
- TV
- Uncategorized
- wales
- Working Platform
- yorkshire