Not consistent with our usual consignments, FPS undertook a rather different project providing a pontoon complete with tower scaffold to do some inspection work on duct work in a nearby swimming pool. The client had explored many options to do this, however, the best and most cost effective way was to have a pontoon in the pool allowing the engineers to explore all areas of the duct work with ease. As the pool didn’t close until 9.30pm, FPS operatives couldn’t commence the install until 10pm, but such was the ease carrying out the inspection we were dismantling the pontoon at 12pm and home for 1pm. The client was extremely happy with our solution and subsequently we have been asked to help with 2 further swimming pools over the next week.