FPS’s latest install was on behalf of British Steel where they were tasked with installing a pontoon into one of their many lagoons. Over the years, the lagoons have become saturated with steel deposits resulting in them nearing their capacity. Hence, a solution was required to clean the lagoons to allow the production of steel for many years to come. To achieve this, FPS installed a 40m pontoon walkway into the lagoon with a working platform at the end. This platform incorporated a ‘well’ which was used to lower an industrial pump that will pump the deposits from the water and subsequently increase the water capacity. The project is going extremely well, and is testimony of FPS’s ability to provide a wide range of innovative solutions using their pontoon expertise.
Recent Posts
Categories
- Accreditation
- bridge maitenance
- Bridge Pontoons
- Canal
- Canal Bridge Repair
- Canal Swing Bridge Repair
- Commercial Pontoons
- Covid-19
- Demolition Work
- Events Pontoons
- Fall Protection Pontoons
- Floating Pontoon Solutions
- Floating Pontoon Walkway
- Modular Pontoon Hire
- Pontoon Delivery
- Pontoon Hire
- Pumping Pontoons
- railwayaccess
- Silt Removal Pontoons
- Sponsorship
- Swimming Pool Pontoons
- Uncategorized
- Working Platform
Tag Cloud
Access
Airport
Bridge
Bridge Access
Bridge Demolition
Bridge Inspections
Bridge Removal
Bridge Repair
Bridge Repair Work
Canal
Canary Wharf
Construction
ConstructionLine
Fall Protection
Film
Floating
Floating Platform
Floating Platforms
Floating Pontoon Platform
Floating Pontoons
Gold
Hire
London
Manchester
Pipe
Platform
Pontoon
Pontoon Delivery
Pontoon Hire
Pontoon Installation
Pump
Railway
Regents Park
Repair
RISQS
Scaffolding Pontoon Access
Scaffold Tower
Scotland
Silt
Swimming Pool
Tow Path
TV
Walkway
Walkway Access
Yamaha SuperJet