After an arduous journey navigating the mountainous roads in the Brecon Beacons, FPS eventually arrived at their destination. This new job was to install a 50m pontoon walkway at the bottom of a near empty reservoir to allow engineers to pump out the silt accumulated over many years. However, this project can only be described as strenuous, as due to vehicle restrictions we had to park away from the reservoir resulting in man-handling the pontoon over 120m, but additionally, the pontoon then had to be taken down 140 steps to the reservoir floor. After 7 hours, FPS finally completed the install and are waiting for the reservoir to fill back up before the collection is made!!!
Recent Posts
Categories
- Accreditation
- bridge maitenance
- Bridge Pontoons
- Canal
- Canal Bridge Repair
- Canal Swing Bridge Repair
- Commercial Pontoons
- Covid-19
- Demolition Work
- Events Pontoons
- Fall Protection Pontoons
- Floating Pontoon Solutions
- Floating Pontoon Walkway
- Modular Pontoon Hire
- Pontoon Delivery
- Pontoon Hire
- Pumping Pontoons
- railwayaccess
- Silt Removal Pontoons
- Sponsorship
- Swimming Pool Pontoons
- Uncategorized
- Working Platform
Tag Cloud
Access
Airport
Bridge
Bridge Access
Bridge Demolition
Bridge Inspections
Bridge Removal
Bridge Repair
Bridge Repair Work
Canal
Canary Wharf
Construction
ConstructionLine
Fall Protection
Film
Floating
Floating Platform
Floating Platforms
Floating Pontoon Platform
Floating Pontoons
Gold
Hire
London
Manchester
Pipe
Platform
Pontoon
Pontoon Delivery
Pontoon Hire
Pontoon Installation
Pump
Railway
Regents Park
Repair
RISQS
Scaffolding Pontoon Access
Scaffold Tower
Scotland
Silt
Swimming Pool
Tow Path
TV
Walkway
Walkway Access
Yamaha SuperJet