Receiving a call on a Monday from someone wanting pontoon on a Wednesday is never an easy task, but FPS’s flexibility and resources allowed just that. The latest project in the Canary Wharf is a new 37 storey apartment block currently being built by over 400 site personnel. However, as part of the project a pontoon walkway was required to allow the construction of some concrete shuttering. FPS provided the walkway which was lifted into place by crane, and once again the client was extremely happy with our quick response and the quality of the work we provided. So much, that we have been asked to provide additional pontoon for the next phase!!!
Recent Posts
Categories
- Accreditation
- bridge maitenance
- Bridge Pontoons
- Canal
- Canal Bridge Repair
- Canal Swing Bridge Repair
- Commercial Pontoons
- Covid-19
- Demolition Work
- Events Pontoons
- Fall Protection Pontoons
- Floating Pontoon Solutions
- Floating Pontoon Walkway
- Modular Pontoon Hire
- Pontoon Delivery
- Pontoon Hire
- Pumping Pontoons
- railwayaccess
- Silt Removal Pontoons
- Sponsorship
- Swimming Pool Pontoons
- Uncategorized
- Working Platform
Tag Cloud
Access
Airport
Bridge
Bridge Access
Bridge Demolition
Bridge Inspections
Bridge Removal
Bridge Repair
Bridge Repair Work
Canal
Canary Wharf
Construction
ConstructionLine
Fall Protection
Film
Floating
Floating Platform
Floating Platforms
Floating Pontoon Platform
Floating Pontoons
Gold
Hire
London
Manchester
Pipe
Platform
Pontoon
Pontoon Delivery
Pontoon Hire
Pontoon Installation
Pump
Railway
Regents Park
Repair
RISQS
Scaffolding Pontoon Access
Scaffold Tower
Scotland
Silt
Swimming Pool
Tow Path
TV
Walkway
Walkway Access
Yamaha SuperJet